Guides

Guides

Start from where the product really is. The goal is not one universal setup wizard; it is a repeatable path with honest evidence at each step.

Choose the path that matches the product’s actual state.

Two six-stage tracks. Do not merge them.

From Prototype

Design-system completeness: Import, Catalog, Names, Cleanup, Rules, Wire.

Open the track →

Engineering Foundation

Production-readiness foundation: Reproduce, Contract, Prove, Harden, Contain, Open.

Open the track →
Engineering Foundation is not From Prototype Stage 7.

The source playbook treats it as a different room and a different tracker.

Shared procedure rules

  • Start from evidence about the product, not from the stage name you hope it has reached.
  • Define what “done” means before doing the work.
  • Do not let progress labels get ahead of files, behavior, or product truth.
  • Keep design-system completeness and engineering readiness as separate clocks.
  • Use the Gap Protocol for genuine system holes instead of improvising hidden local standards.